Drainage and Infrastructure

DRAINAGE & INFRASTRUCTURE

We get the job done! Right.

Drainage 

General Civil and Site Works

Construction

 

ABOUT US

Set up by Gary Almond in 2013 we are extremely sought after drainage and infrastructure contractors.  No job is too big or too small and we do  both residential and commercial work. 

 

Our team is  licensed and certified, highly experienced, fit and reliable. We have built up strong industry relationships and have an excellent work ethic. So you can absolutely count on us to get stuck in and get the job done right!

Need drainage, infrastructure solutions, manhole installations, retaining walls, subdivisions, house cuts and foundations.. or something as unusual as a long elevated boardwalk?  We will get it done.

We design, price out, plan and finish every project:

- Within budget

- On time

- To a very high standard

- Everytime

 

Projects

IMG_0118_edited_edited.jpg
OMAHA BOARDWALK
50m Long Wetland Solution

A wetland area at Omaha Beach, North of Auckland, was experiencing ongoing flooding issues. 

 

Contracted in by Downers Ltd we:

 

  • Constructed a 50m long elevated boardwalk

  • Ensured drainage was effective

  • Ensured it wound attractively to the beach

  • Ensured minimum disruption to the natural environment

 

This project was completed in just 2.5weeks.

 

February 2018

Worker_edited.jpg
ST HELIERS - DINGLE PARK
Manhole and Hard Piping a Stream

Working with Glasgow Ltd, to hardpipe a stream, we:

 

  • Connected a 900mm diameter concrete pipe to an existing 900mm diameter line

  • Added a 2050mm storm water manhole.

  • Used a 1000mm HDPE pipe to sleeve the existing 1200mm hard piped bridge.

 

The challenge (and fun!) of this project, was creating custom engineered bends to suit the existing and natural flow path of the stream.

Three of our team completed this project in under 2.5 weeks. 

 

February 2019

Z1FaPD_Q_edited.jpg
MANGAWHAI CAMPGROUND
140m Long Retaining Wall

The Riverside Campground in Mangawhai was losing land to erosion. 

Working in this tidal area we:

  • Excavated 200 cube of earth

  • Contracted Markovina Pile Driving to drive 6.0m 250SED retaining poles 4.2m into the ground via vibration.

  • Built a 140m long retaining wall

  • Back filled the land to protect their property.

 

This project took 6 of our team just 2 weeks to complete.

October 2017